           > The Event of Flood


           > During Hill/Landslides

 

  1. Receive report from District Engineer
  2. Verify the site and situation of the flood
  3. Send team to the scene
  4. Set up 'Ranging Poles' and singnage
  5. Make sure the works are carried out in safe manner
  6. Report the situation of the flood via telephone immediately
  7. Ask for JKR's help when necessary
  8. Place notices informing road closure and flood level situation at major crossings as well as at each end of efected area
  9. Place warning lights at the affected area
  10. Monitor flood situation continually
  11. Examine all culverts and bridges for signs of cracks after heavy downpour
  12. Carry out repair works once instructed

 