Our Services


       Routine Maintenance Works


       Periodic Maintenance Works


       Emergency Works


       Contingency Works


           > The Event of Flood


           > During Hill/Landslides

 

 

Routine Maintenance Works are carried out out based on a basis or pre-defined cycle for various work activities. The activities are categorized into seven differences component i.e. maintenance of pavement, road shoulder, grass cutting, road furniture, bridges & culverts, drainage and routine inspection. 

 

 

RO 1 - Pavement Maintenance
Pothole patching, sealing of surface cracks, reinstate edge deterioration of back filled trenches.

 

RO 2 - Shoulder Maintenance
Re-grading and topping up of shoulders as required, filling irregularities in unsealed shoulders and filling pavement/shoulder level differences.

 

RO 3 - Grass Cutting
Cut and dispose grass to the limit as per cycle, clear vegetation on paved surface, treatment to deterioration of concrete pavement, repair to concrete pavement joints and repair to paving blocks and slabs



RO 4  - Road Furniture Maintenance
Cleaning of road signage, guardrails, kilometer posts and delineator posts as per cycle



RO 5 - Bridges and Culverts Maintenance
Cleaning works and removal of vegetation as per cycle


RO 7  - Drainage Maintenance
Cleaning and desilting works as per cycle


A - Landscape
Not applicable since 2006

 

B - Routine Inspection
Routine Inspection of all activities and conditions of road as per cycle

Copyright